Our references

© Parc du Futuroscope – Architecte : Denis LAMING




As per October 6th 2011 the following grid connected installations are up and running:



  • In Poitiers area : 17 333,61 kWp
  • In Clermont Ferrand area : 1 382,03 kWp
  • In Dijon area : 1 723,14 kWp

TOTAL : 20 438,78 kWp